Thursday 6 September 2012

September 2012

This month we have structural steelwork and a tube clamp contract.

The steelwork in the picture is for a loft conversion.
These were drilled and finished red oxide primer.


 
 
 
The above picture is of the cut tubes ready for drilling in order to hang them for powdering.The bottom picture is of the tubes completed ready for delivery.

We undertook the 30 metres of keeklamp contract with a very fast turnaround time.The tubes were cut to length,and powder-coated blue.Also all of the fittings were powder-coated blue.

Later this month we will be manufacturing a metal door and undertaking some more steelwork for a London based client.

We have received a lovely photograph of a project that has now been completed by our customer-we manufactured the frame for this table and the top has been cut and fixed by our customer-it is eucalyptus wood.A useful and pretty addition for any garden-complete with tea!