Wednesday 11 December 2013

DECEMBER 2013

HAPPY CHRISTMAS TO ALL OUR BLOGSPOT FOLLOWERS


THIS MONTH WE HAVE BEEN BUSY MANUFACTURING RAILINGS.BELOW ARE THE PICTURES.




 
GALVANIZED RAILING PANEL
 

 
RAILING SPEARHEAD DETAIL
 

 
HOOP TOP RAILINGS AFTER GALVANIZING
 

 
RAILINGS COMPLETED WITH POWDER-COATED FINISH
 

 
 
 
WE HAVE ALSO UPDATED THE MAIN WEBSITE TO INCORPORATE A NEW COLOURFUL BANNER TO BRIGHTEN UP THE SITE-HOPE YOU ALL LIKE THE NEW LOOK.
 
 
MERRY CHRISTMAS AND A HAPPY NEW YEAR -UNTIL 2014.................


Thursday 14 November 2013

November 2013

The thermal vests are out yet again and with the threat of colder weather to come we are practising our star jumps and feet stamping in order to keep warm-no heating on until the snow is at least three inches thick!!

We have just completed a very smart set of bifold driveway gates.Finished black gloss paint.


The above will fold back to allow a car access to the driveway.

We have also undertaken some gate repairs as a vehicle struck and collasped the brick pier and knocked the gate down.This will be refixed by the builder soon.

Christmas is fast approaching but we have plenty to complete before then.

Until the December news...............................

Wednesday 23 October 2013

October 2013

Welcome to October's Blogspot.As promised we have all the photographs of the church gates,all finished and fixed on site.Plenty of rain but not cold.



The church where we fitted the gates. 



Gate in workshop after painting.



First set of double gates.


Second set of double gates with church name in silver letters.


Lettering on the gates.


Single pedestrian gate.



We have also undertaken manufacture of some security bars.Finished black satin.



We are also fixing the security door mentioned in September's blog.

Happy Halloween!-until November.....................................................




Friday 13 September 2013

September 2013

Hello to all our Blogspot followers-Autumn is slowly creeping up on us but not yet time for the thermal vests!This month has been a busy time and we have undertaken a variety of Metalworking projects.Below is a picture of our latest security door.This door will replace an old wooden one which protects a side alleyway.The rolling raptor spikes will be fitted above the door to stop climbers.

We are also starting to manufacture new gates for our local church which will be really smart when finished.The pictures of these will be published in October's blog.We are using different spearheads on this project which are in keeping with the church.Also the church name will be on the gates and will stand out for passers by.Look forward to showing the photos off soon.

  
New security door with mesh panel for visual access.

 
Raptor spikes to be fitted above door.
 
 
 
Look out for the photos coming in October.  

Wednesday 14 August 2013

August 2013

This month we have fitted a sign board using angled brackets and new supports with RHS.The picture is below and it has meant that visitors can view the sign board from the platform.


 
Sign Board Brackets and Support Metalwork.
 
 
We are also manufacturing some steelwork,mesh frames for a staircase and  installing some tube handrails. 


Monday 8 July 2013

JULY 2013

This month we have completed a contract to make tubes for a theatre to hold the scenery and curtain backdrops.


Colour coded tubes depending on size.



Also we will be manufacturing some loft conversion steelwork.


Until August..................


Wednesday 19 June 2013

June 2013

Lovely weather is here at last and we have been manufacturing lots of different items.Below is a couple of jobs we have recently completed.

 
Structural Steelwork for loft conversion.
 
 
 
We have also manufactured some frames,when these are bolted together they make stands for rowing

boats to rest upon. 


 
 
We are also manufacturing some metal tube frames.We purchased a new bending machine in order to carry this out,there are further details about this on the main website.
 

 


 
New tube bender.
Frame sections bent to shape.
 
 
The rest of this month will be spent manufacturing another batch of the above frames.
 
Hope that weather continues
-until July.......






Monday 13 May 2013

MAY 2013

This month we have managed to keep the thermal vests off and are enjoying the odd day of better weather.
The safety ladders mentioned in April's Blog are now fixed on site and the pictures are below.
Great view of the Shard from the roof area.


Bottom Ladder
 
 
Intermediate GuardRail
 
 
Ladder to roof area
 
Ladder up post to roof area
 
The SHARD from the roof.
 
London City Buildings
 
 
This month we are fabricating a balustrade and a metal roof walkway which we will feature in our next Blogspot.We will be busy fabricating and fixing for the rest of May,so until next time.............

Friday 12 April 2013

APRIL 2013

We are still hoping for Spring to arrive but the thermal vests are still firmly in place!

This month we have rebated some aluminium light couplers so that larger fixings may be used.
 
 
 
 
BEFORE
 
AFTER
 
 
We are also undertaking some replacement safety ladders for access to a roof area.These will be fixed shortly.  
 


 
Fabricated and ready for painting.
 
 
Painted and ready for fixing.
 
 
We are also undertaking some security work to stop a gate from being climbed over.The spikes pictured below will be placed over the top of the gate with a warning sign.
 
 
Plastic security spikes that spin on the centre fixing.
 
  Looking forward to May's Blog when hopefully we will have better weather.

 

Tuesday 5 March 2013

March 2013

 

Spring is nearly here and we are all hoping for warmer weather.Lower fuel prices would also be an added bonus!
 
This month we have completed the railings that we started manufacturing in February.The pictures are below.
 
 
Railings
 


We have also manufactured a burning bin which collapses for easy storage.The sides slot together and can be stood up seperately when dismantled.
 


This month we have a lot of different contracts to complete but will cover all of these in April.