This month we are fabricating three staircases which are fixed from a centre boom,each one is different in the sizes and fabrication requirements.Below are some pictures of the metal components and more pictures will follow as we progress.



Metal waiting to be cut.


 
Cutting of metal on Band Saw.
 

 
Metal Plates cut for the stair treads. 
 
 
 
We are also undertaking the manufacture of some lighting troughs and some alleyway gates.
 
Pictures to follow on these.
 
 
Hopefully you haven't been affected by the flooding,we have been lucky and have been following all the updates on the news-if you have been then we hope you get back to some normality soon.
 