Friday 26 June 2015

JUNE 2015

Welcome to the June blogspot,we have bare metal to finished article below:


Bare cut metal ready for fabrication.


Metal flats marked out and drilled.


Metal rings ready for welding into the railing.


MIG welding of railing.


Railing panel completed and ready for galvanizing.


Railing Panel after galvanizing.


Railings completed and fixed.


Close up of one of the railing panels.
All finished black powder-coated.

Also this month we have manufactured the above wedding arch for a
professional florist.

Until July-enjoy the warm weather................