Tuesday 13 September 2016

September 2016

Welcome to the September Blogspot,this month covers from bare metal to finished product of some special metal supports-see the video below for the completed article.


Drawing of structure.


Metal outside awaiting cutting to length.


Angles cut and awaiting drilling.


Drilling of angles.


RHS sections cut,drilled and awaiting welding.


Moving metal around the workshop,the old fashioned way!


All angles and end pieces.


Bolts,nuts and washers counted out and boxed up.


Welding of end pieces which will bolt to the angles.


End piece welded on. 




See the video below that shows installation by our customer. 


Above are the photographs of the finished article installed by our customer at Heathrow Airport.



This month we have also found the time to replace the welding bench with all new RHS sections.Although it does not look straight in the picture it has been packed and checked to ensure it is perfectly square and level.

Until October........................