Monday, 8 July 2013

JULY 2013

This month we have completed a contract to make tubes for a theatre to hold the scenery and curtain backdrops.


Colour coded tubes depending on size.



Also we will be manufacturing some loft conversion steelwork.


Until August..................


Wednesday, 19 June 2013

June 2013

Lovely weather is here at last and we have been manufacturing lots of different items.Below is a couple of jobs we have recently completed.

 
Structural Steelwork for loft conversion.
 
 
 
We have also manufactured some frames,when these are bolted together they make stands for rowing

boats to rest upon. 


 
 
We are also manufacturing some metal tube frames.We purchased a new bending machine in order to carry this out,there are further details about this on the main website.
 

 


 
New tube bender.
Frame sections bent to shape.
 
 
The rest of this month will be spent manufacturing another batch of the above frames.
 
Hope that weather continues
-until July.......






Monday, 13 May 2013

MAY 2013

This month we have managed to keep the thermal vests off and are enjoying the odd day of better weather.
The safety ladders mentioned in April's Blog are now fixed on site and the pictures are below.
Great view of the Shard from the roof area.


Bottom Ladder
 
 
Intermediate GuardRail
 
 
Ladder to roof area
 
Ladder up post to roof area
 
The SHARD from the roof.
 
London City Buildings
 
 
This month we are fabricating a balustrade and a metal roof walkway which we will feature in our next Blogspot.We will be busy fabricating and fixing for the rest of May,so until next time.............

Friday, 12 April 2013

APRIL 2013

We are still hoping for Spring to arrive but the thermal vests are still firmly in place!

This month we have rebated some aluminium light couplers so that larger fixings may be used.
 
 
 
 
BEFORE
 
AFTER
 
 
We are also undertaking some replacement safety ladders for access to a roof area.These will be fixed shortly.  
 


 
Fabricated and ready for painting.
 
 
Painted and ready for fixing.
 
 
We are also undertaking some security work to stop a gate from being climbed over.The spikes pictured below will be placed over the top of the gate with a warning sign.
 
 
Plastic security spikes that spin on the centre fixing.
 
  Looking forward to May's Blog when hopefully we will have better weather.

 

Tuesday, 5 March 2013

March 2013

 

Spring is nearly here and we are all hoping for warmer weather.Lower fuel prices would also be an added bonus!
 
This month we have completed the railings that we started manufacturing in February.The pictures are below.
 
 
Railings
 


We have also manufactured a burning bin which collapses for easy storage.The sides slot together and can be stood up seperately when dismantled.
 


This month we have a lot of different contracts to complete but will cover all of these in April.

Tuesday, 12 February 2013

February 2013

This month we have been manufacturing a railing.We were provided with wooden templates and drawings.
We cut the material to length,worked out the drilling and tapping positions,undertook the drilling and tapping.  
 
 
Drilling of railing components.
 
 
Tapped railing components.
 
 
We then undertook the welding together of the metal and put in the metal pattern detail.
 


 
Manufactured railing panel ready for sanding down.  
 
 
 
We will also be ordering Aluminium sheets for a customer to use as a base for his machinery to keep his floor clean.
 
The other project is a collaspible burning bin that will be large when placed together but will be dismantled and stored in a shed.There will be some pictures of this later.
 
Still hoping for some better warmer weather-here's to upcoming March.