Monday, 18 August 2014

August 2014

Welcome to the August Blogspot-the year is flying by and very soon there will be Christmas cards etc in the shops!We have some photographs below of our latest contracts.


Heating of metal in order to twist.30mm solid square bar.
 

 
30mm solid square bar awaiting heating.
 

 
Completed twist.
 
Pictures to follow of completed panels that will be fitted either side of an existing gate.
 

 
Alleyway gate with side panels.
 
 
 
Our hanging baskets have been a great success and we will no doubt have a new set next spring when these have finished for the season.
 

 
Fuscia's outside the workshop entrance.
 
 
Hope you have enjoyed August's Blogspot-Until September enjoy the last of the lighter evenings and warm weather...............................................  
 
 
 



Monday, 21 July 2014

July 2014

Welcome to July's Blogspot with Hot Weather and thunderstorms-we have been busy completing our contracts that we started in June and the final pictures are below:



 
Gates with wooden infill panels-Front view



 
Back of gates
 
 
 
We have also completed the Church gates which we documented in June's Blogspot.

 
Church gates completed.
 
Hoping for cooler weather and there will be plenty more projects coming up on the Blogspot-Until August .................................................................................................................................................  


Tuesday, 24 June 2014

JUNE 2014

Welcome to June's Blogspot.This month has been a very busy time with lots of different projects that have taken time to complete as they have undergone various stages.Below is the first stage of the church gates.The final stages will be covered in July's Blog.




Drawing of design for Customer's Church meeting.

One of the metal circle inserts,cleaned and ready for welding into position.


Railing being manufactured.


Completed gate.

Metal rings cleaned by sanding ready for gate.

The other pair of gates that we have manufactured are below,at the galvanized stage and ready for painting.Gate posts are also in the background that will be holding the gates into position.

For July will be the next stages of both of these gates.......




Monday, 12 May 2014

MAY 2014

This month is time to welcome Lola our Mitsubishi Shogun who replaces Bubba.


 
Lola
 
We have manufactured and fitted some railings and gates.
 

  


 
 
We are also manufacturing some gates with wooden panel inserts-pictures to follow in June.............
 


Tuesday, 22 April 2014

April 2014

This month we have finished the three staircases.They are now all fixed into position on site.

The light boxes were all fitted as well,we had to keep them under wraps to protect the powder coated finish so no photos were taken of these.The final colour was Anodic brown which blended into their surroundings well.

We have manufactured a set of doors for a bin store area.Pics below:






The next project was to make a decorative tree which is then covered in moss etc and used as a centre table piece for Wedding receptions.



We are now manufacturing some railings and gates.


Lastly but not least for April is time to say goodbye to our faithful old workhorse' BUBBA'-our Mitsubishi Pajero who is off to Poland to start a new life after serving us well for 100,000 miles.


Until May..........................

Friday, 14 March 2014

March 2014

Welcome to the March blogspot-warmer weather and the first signs of Spring are on their way.
The staircase is progressing and is now ready to be fitted on site.


Below are the new photographs of the staircase which has now been powder-coated.












Treads after powder-coating

We are also undertaking the manufacture of some metal boxes to hold stage lights.Pictures below.







More pictures to follow of the light boxes once the powder-coated finish has been applied.

Until the next instalement.........................................


Friday, 21 February 2014

February 2014

This month we are fabricating three staircases which are fixed from a centre boom,each one is different in the sizes and fabrication requirements.Below are some pictures of the metal components and more pictures will follow as we progress.



Metal waiting to be cut.


 
Cutting of metal on Band Saw.
 

 
Metal Plates cut for the stair treads. 
 
 
 
We are also undertaking the manufacture of some lighting troughs and some alleyway gates.
 
Pictures to follow on these.
 
 
Hopefully you haven't been affected by the flooding,we have been lucky and have been following all the updates on the news-if you have been then we hope you get back to some normality soon.
 
Heres to March..........may it stay dry..........