Wednesday, 19 July 2017

July 2017-metal handrails for concrete steps selsdon area,metal alleyway gate, metal balcony


Where did June go to?now we are almost at the end of July,so as always we have a snapshot of our latest completed work contracts.......


A completed rear garden,handrails to rear wall area,top wall area and lower step area.


Lower step area close up,left hand side.


Lower step area close up,right hand side.


Handrail for top garden steps.


New metal gate to alleyway.


Height of existing balcony changed by adding new metal bars and top rail.


New railing to wall area


Close up photograph of balcony height extension.

More new projects to follow for the August Blogspot,until then enjoy the rest of the Summer......

Thursday, 15 June 2017

June 2017-metal handrails for brick steps,external metal staircase

The sun is shining (well not all of the time)and this is June's blogspot................................




New wall handrail and floor fixed handrail outside frontdoor.


Aluminium sections to be used as a railway display track for a model locomotive.




Old cast iron staircase-to be replaced by new mild steel one. 



New mild steel staircase components ready for fixing. 



New mild steel staircase completed.


Hanging basket-fuscia


Hanging baskets outside workshop entrance.

For July we will have a completed gate,staircase and balustrade and various other projects............ 


Wednesday, 14 June 2017

MAY 2017-metal handrails for nursing home croydon area,metal alleyway gate

Welcome to the May Blogspot,pictures of completed handrails and security gates............
In April's blogspot there is a picture of the handrails below in galvanized finish before powder-coating.


D-shaped handrails leading to garden area.


Handrails to conservatory


Wall handrail


Handrails to ramp area


Handrails to front door.


Gates to alleyways-arched top and fleur de lis.


June's blogspot will feature a new staircase and some more handrails............................

Friday, 21 April 2017

April 2017-metal handrails for outdoor steps

This month has been very busy completing contracts and starting of new work.Below are some completed items.



Metal handrail to the front door.


Metal Handrail to the rear garden steps.


Metal Handrails to the front door,with twisted bars and baskets.


The handrailing below is part of a larger project to manufacture,supply and fit nine handrails like this one for a Nursing Home..more pictures of this to follow next month.  


Lots more to follow in May......................

Monday, 27 March 2017

March 2017-metal handrails for outside steps,metal wall handrail

Spring has sprung and the new born lambs are out and about-bulbs are thriving.
Although the thermal vests are off it is still cold first thing on site and in the workshop.
Below we have Spring scenes and the latest projects-some finished and some still to be fitted on site..


 Cute Lambs..



Below are sections of a handrail which will be fixed to front steps. 



Handrail end detail.


Completed panel. 


Black gloss paint finish



The two rings below will be hung on chains to support a floral display for a wedding.



These frames are actually a mobile drinks bar that will be used for events.
They have stainless steel tops and shelves and come apart for easy transportation.


Picture of bar sections.


New metal handrails to garden decking area


Handrail to rear garden steps


Wall handrail to garage steps



That is all for March-plenty more projects to manufacture and fit so until the next Blogspot..............

Tuesday, 28 February 2017

February 2017-bespoke metal boxes,florist metalwork

Welcome to February's Blogspot,plenty of different projects below: 


This driftwood tree will be mounted on to a metal stand by drilling the end of the tree.


The metal base for the tree. 


The start of a new project-working to the drawings below.
This will eventually be a display wall for a tile showroom,the boxes will be fixed
to the wall and tiles placed inside them.



Metal plates cut-360 number by a specialist firm.



Manufacturing a quartered box.


Manufactured single boxes
ready for painting by hand.


Painting of boxes in black matt paint. 


The wrapped box wall starts to grow!


Seventy one boxes completed,wrapped and ready to be delivered on time.



Below is a railing run where we had to reinforce the top and bottoms of the existing fence.
We drilled and security fixed box sections to the top and flat sections to the bottom.
All finished galvanized and powder coated to match the existing.



The beginning of the atriums....making the panels.
For this it is about cutting the angles correctly. 


Welding the sides together.


Looking down on sides.

Finished article in self colour stage.


Colour samples for our customer
Ral 7024 was chosen and the atriums powder coated.
These will be filled with plants and flowers and placed in a London bar.


Next month will feature a mobile bar.Pictures and story to follow + any other news that happens,so
stay tuned.....................Until March.